Astra
Read the JD + Q2 OKRs. Drafted:
**Days 1-30 — Learn:**
• Read: ARCHITECTURE.md, last 6 RFCs, top 20 customer call themes (Granola).
• Meet: Sarah (eng lead), Ben (PM), Lisa (top customer), 5 more — calendar set.
• Provision: GitHub, Linear, Okta apps, Brex card, AWS read access.
• Ship: 2 small fixes from the "good first issue" Linear queue. Goal: first PR merged by day 14.
**Days 31-60 — Contribute:**
• Lead the webhook-retries project (top customer ask, $23k MRR exposed).
• Pair on the auth refactor with Sarah (Q2 OKR #2).
• First on-call shadow rotation.
**Days 61-90 — Own:**
• Full ownership of the integrations subsystem.
• Day-90 strategic proposal: "How we cut p99 latency 40% in Q3."
Calendar series scheduled, Slack onboarding-buddy intro drafted. Notion doc ready — want me to share it with Marcus and his manager now?